Facilities

Our state-of-the-art construction halls and workshops in Falmouth are used by over 380 highly skilled tradespeople creating one of the best facilities in Europe for the custom build, refit, remodel and restoration of 30m-100m superyachts.

Pendennis’ offering was expanded in 2010 following the acquisition of Devonport Yachts, now known as Pendennis Plus, giving the yard further expertise in 60m+ vessels.

In 2011 the addition of the Palma Refit office extended Pendennis’ European presence and provides more effective long-term yacht support throughout the Mediterranean.

Falmouth

Falmouth

Pendennis Falmouth is a full service facility capable of building custom yachts up to 100m, as well as undertaking substantial restoration and remodelling projects or routine class/flag refit works.

Pendennis Palma

Pendennis Palma

Launched in July 2011, our base in Palma, based at STP, is a keystone in Pendennis’ customer centric approach.


Falmouth

The recent developments have seen the yard facilities improve and expand dramatically.
Two 90m and a 45m construction halls tailor-made for superyacht projects
Specialised workshops based in our Refit Building, with satellite workshops in the project halls
Environmentally-controlled onsite Paint Workshops provide an immaculate finish
Substantial Storage for Yacht Equipment and supplies
Clients can fly directly into the Pendennis via helicopter from Newquay or London
Onsite specialists in Engineering, Fabrication, Interior & Exterior Finishing, Paint, Electrical, Technical & Interior Design
The 150m dry dock can be divided into two 75m spaces
Hemisphere moved to the Outer Dock following her completion
SY Mariette
Specifically designed for onsite paint works

1 of

Pendennis Falmouth is a full service facility capable of building custom yachts up to 100m, as well as undertaking substantial restoration and remodelling projects or routine class/flag refit works. The on-site facilities include a selection of purpose built workshops, offices and storage for our tradespeople and crew, as well as two 75m undercover dry docks, which are 100% environmentally controlled with a state-of-the-art dust extraction system – perfect for large scale superyacht painting.

Two new 90m construction halls have been created alongside an additional 45m hall. The central spine holds hosts project offices and workshops with direct access to the construction bays. An additional four storey building has increased office and workshop space with the addition of an impressive hospitality suite.

Construction of a non-tidal wet basin was completed in May 2015, providing direct seaward access to Pendennis with a holding area before and after their time in the yard, as well as a base for short refit works for yachts of up to 100m.

The Pendennis Yard Development project is part financed by the European Regional Development Fund Programme 2007 to 2013. The Department for Communities and Local Government is the managing authority for the European Regional Development Fund Programme, which is one of the funds established by the European Commission to help local areas stimulate their economic development by investing in projects which will support local businesses and create jobs. For more information visit www.gov.uk/browse/business/funding-debt/european-regional-development-funding

    Falmouth Facilities

  • 2 x 75m fully enclosed Dry Docks (or one 150m x 24m)
  • 2 x 90m Construction Halls (1,800m²)
  • 1 x 45m Construction Hall (1,200m²)
  • 7,564m² of Enclosed non-tidal Wet Basin
  • 640 tonne Travel Hoist
  • 1400m² Refit Complex (housing paint, joinery and engineering workshops, and project management offices)
  • Bespoke 80m Mast Hall
  • 200m² Finishing Workshop
  • 1200m² General Stores and Crew Storage
  • Crew Facilities: Training Centre, Gym and Offices
  • 420m² Hospitality Suite
  • Onsite Helicopter Pad

Pendennis Palma

Fair Lady is relaunched following her refit (photography Stuart Pearce)
Based at STP, Pendennis Palma provides a convenient Mediterranean refit centre
Specialist Pendennis staff support local contractors
Specialist Pendennis staff support local contractors

1 of

Launched in July 2011, our base in Palma, based at STP, is a keystone in Pendennis’ customer centric approach. Focused on assisting clients with routine maintenance and interim works the facility provides continuity of care and ongoing support from Falmouth based at a convenient location in the Mediterranean.

    Pendennis Palma Facilities

  • 70,000m² ground surface
  • 35,000m² surface mooring
  • 6 Pits for deep draft sailboats
  • 5,000m² workshop
  • High Flow Gas Station
  • 5 Travelifts: 700tn, 200tn, 150tn, 100tn, 30tn